Technical Specification, Supplier Qualification & Quality Assurance
Define materials and processes, identify or assess suppliers, test samples and establish factory-level quality requirements before scale production starts.
EURAN · ART ACQUISITION & DEPLOYMENT
THE DEPLOYMENT BRANCH
From selected art to a controlled physical result.
Deployment begins once the project knows what art it intends to use — whether sourced by EURAN or provided by the client. EURAN may then define the programme, specify materials, qualify suppliers, direct production, establish prototypes, control quality, coordinate logistics and control placement and installation.
The client may appoint EURAN for one stage, selected stages or the complete deployment chain.
Define materials and processes, identify or assess suppliers, test samples and establish factory-level quality requirements before scale production starts.
Translate approved art into controlled production specifications, prototypes and repeatable output.
Develop frame, mount, glazing, substrate and fixing solutions as one coordinated presentation system.
Establish physical samples and reference units before mass repetition.
Protect, code, sequence and coordinate the movement of finished art products to the project.
Define exact positioning, establish reference installations by typology and inspect the rollout for conformity and corrective action.
Where EURAN is appointed to direct or verify third-party realisation, the role is to protect the owner's approved result rather than the interests of a printer, framer, fabricator or installer. This may require direct work with the client's existing suppliers, EURAN-qualified suppliers or a mixed project team.
The client remains free to retain its own suppliers. EURAN can define specifications, evaluate their capability, direct technical execution and control conformity without taking over the client's procurement structure.
THREE COMMERCIAL ROUTES
The technical scope may be similar while the commercial and contractual role is different. EURAN therefore identifies the route before suppliers are committed.
The client contracts third parties. EURAN acts on the owner's side for the expressly appointed specification, qualification, direction, quality-control, validation or Acceptance scope. The applicable Professional Appointment and External Realisation Direction remuneration are defined under the current TPA™.
EURAN contracts the production chain and supplies a defined package to the client under an accepted quotation/order and applicable Production & Supply Conditions. No automatic Direction Fee is added to the same EURAN-supplied value.
The client selects and manages production. EURAN is appointed only for a bounded technical, prototype, QA, placement or control role. There is no automatic percentage on production expenditure EURAN is not appointed to direct.